Home > Powerstroke Turbos > 2011-2016 6.7L
Sort By:
Page of 1
S300 Rebuild kit with the 270 degree thrust bearing.
Comes with everything you see in this image. New std bearings, thrust, snap rings, compressor and turbine piston rings, o-ring, compressor and turbine bolts

INSTALLATION METHOD FOR HEAD STUD KITS
Part Number: 250-4301 Application: Ford 6.7L Powerstroke Diesel

  1. Always verify the part number for your application with the part number on the side of box and the part number on the instruction sheet. This will help ensure you have the correct installation procedure for your specific application before installing any components.

  2. Clean and inspect all hardware prior to installation. Look for obvious defects or shipping damages, plus proper fit, length and dimension.

  3. To ensure proper thread engagement and accurate torque readings, clean ALL threads in the block. Chase if necessary with ARP Thread Chaser, part number 911-0008 (M12 x 1.75).

  4. If the cylinder head studs protrude into a water jacket, lubricate the block threads of the studs with ARP THREAD SEALER.

  5. Screw studs into the block “HAND TIGHT ONLY”.

    NOTE: LOCTITE MAY BE USED IF A PERMANENT MOUNTING OF THE STUDS IS PREFERRED.

  6. Install the cylinder head(s) and check for binding or misalignment.

  7. Lubricate the stud threads, nuts and washers with ARP ULTRA-TORQUE FASTENER ASSEMBLY

    LUBRICANT. Then install the washers and the nuts onto the studs and tighten them hand tight.

    PRELOAD (TORQUE) RECOMMENDATIONS

  8. Following the manufacturers recommended torque sequence, tighten the 12mm nuts in three equal steps to

    the following specification with ARP ULTRA-TORQUE. Then tighten the 8mm nuts to the following specification in one step with ARP ULTRA-TORQUE.

    Studs1-18,12mm 125 ftlbs Studs 19-22/ 23, 8mm 28 ft lbs